Door and Siding Colors and Styles – Sandy

Allura prefinished product discontinued as of January 2021. Now the only manufacturer of vertical 8” cement siding strips is Hardie board (vertical Sierra 8). Hardie board does not come as a prefinished product so the siding will need to be painted. Allura also discontinued stucco boards.

RA working on discount at Sherwin Williams (SW). Sandy is finding colors at SW that are similar to what we had chosen in December from Allura. Paint samples ordered and will arrive later this month.

No word back from RA re: door styles with windows in them.

Cluster Clean up – April 24th

Projects:

  • Clean and sand benches by tot lot (Cyndi)
  • Bin for trash can at tot lot (Sandy)
  • Need 2 x 6 board for steps, cut to length (Ruth)
  • Trash collection (Lily)
  • Re-planting daylilies in upper cluster island where bed was damaged (Kristina/Mike)
  • Sign washing (Elli)

Parking Lot

Tri-technologies did not show up for the scheduled Zoom meeting regarding asphalt rejuvenation. Cluster does not intend to reschedule, as most advice has been that rejuvenation will not delay grind and mill.

Finley (Joe) provided estimates for grind and mill and suggested doing work before 2025. Quote for the entire parking lot was $76,000. Joe said patching would be okay if we want to hold off until 2025 but would cost between $10,000-15,000 each time we need to patch.

Dominion (Nathan) will provide quotes for the entire parking lot, just the areas that are driven on, and patching rough spots. They agreed with Finley that the top layer of asphalt is too thin to last until 2025 and suggested moving the grind and mill to an earlier date. 

Erosion

Need an estimate for erosion work on the hill by Cyndi’s house. No word back from Chris, yet. Kristina will look into it more, including a pathway for people to walk behind houses.

Jose De La Cruz spoke with Sandy about putting a 12 x 12 square drain behind Karen Beasley’s yard and running a French drain behind the adjacent houses for $2700

Cluster received a letter from RA about being out of compliance with the vegetation surrounding rock swales related to recent erosion work. Kristina will continue to investigate exactly where the non-compliance occurs and exactly what RA wants us to plant in those areas.

Landscaping

Cluster will offer to order bags of mulch to be delivered to the neighborhood. Residents need to order the number of bags they want and will be billed through the cluster. 

The turf was recently fertilized and overseeding will occur at some point in the future to the lawns that were seeded in the fall.

Concrete

Sandy and Kristina talked about the possibility of putting in a railing by the stairs in front of 2245 rather than having them redone. Cyndi reached out to Juan. 

Garbage and Recycling

Board decided to hold off on switching from Bates to another provider. Prices were competitive but did not include extra features like dumpsters and large item pickup.

Need the voucher for the dump fee for the roll-away dumpster that will be here during the cluster cleanup

Other topics? 

Chemical/hazardous waste pickup date? (Sandy – but Kelly will also try to reach out to Chris)

Financials

Financials were discussed. Cluster dues for the 2nd quarter were sent out in April.

Next meeting 

May 13th at 7 pm via Zoom